EMBERS
PROTECTION SERVICES
PROPERTY STUDY 154 + 156 / EB

LAGUNA BEACH, CALIFORNIA

154 + 156 Emerald Bay.

18 stations coordinated across all nine EPS sheets.

Opening the architect’s model…

Preparing architecture, water and ember trajectories.
SOUTH-EAST / OVERVIEWTRUE-SCALE GEOMETRY
Drag to orbit · Scroll to zoom · Right-drag to pan

ABOUT THIS SCENE

The actual architecture.
The existing EPS system.

Converted locally from the architect’s Emerald Bay Revit Export 20260910.skp, with the original roof, terraces, pool, site geometry and material maps.

All nine August 17 EPS sheets are reconciled: 154 has eight structure-defense and five perimeter heads; 156 has five structure-defense heads. Overview symbols are not counted twice. Existing roof housings and perimeter assemblies retain their original scale; perimeter risers are six feet tall. Positions are registered to the September architect model and to their individual levels. The two architectural revisions differ at some terraces. Mount heights and undimensioned arc settings remain visualization assumptions.

Water uses the existing Blender launch velocities, wind, drag and particle sizes, with first-hit collisions recalculated against this property. Blue water improves visibility. The six-second source sequence repeats at a slower presentation speed; this is a visualization, not a coverage certification.

The neighboring houses and cliffside planting are simplified context based on the supplied aerial image. The fire sequence is an illustrative scenario: perimeter activation, structure activation, surrounding vegetation and neighboring structure fire, then clearing. The proposed client building remains the original architect model.

Keyboard: arrow keys orbit · + / − zoom · Space pauses · Escape closes.

EPS.1–EPS.9 / AUGUST 17, 2026

Every head has a plan reference.

18 unique stations. Inspect a head to reveal its level with a building cutaway. Perimeter risers: 6 ft. The September architecture differs from the August plan backgrounds; heights and undimensioned arcs require coordination.

Open the annotated nine-sheet audit ↗